- Structural analyses to ensure integrity of various components of offshore platform ( modules, helideck, caissons, conductors etc)
- Fatigue check of platform components (decks, connections, modules) under cyclic loadings
- Review of analysis and design calculations by contractors, discuss and comment (caisson clamps, grouted sleeve repairs, integrated deck analysis etc)
- Defining structural inspection strategies
- Establish needs for various repairs on caissons, including internal or external repairs, temporary mitigations and also inspection requirements.
- Risk ranking of caisson activities and liaise with asset for inclusion in activity plans
- Repair of damaged well conductors, various inspections and temporary mitigations
- Certifying structural aspects of a bridge connection between platform and accommodation vessel
- Management of platforms structural anomalies
- Fabric Maintenance strategy for offshore platforms. Define, approve and control of the annual platforms’ fabric maintenance scope and managing changes
- Compiling the annual topside structural inspection scopes based on the Risk Based Inspection strategies
- Review the inspection reports, compile platforms inspection summary and take necessary actions on findings (raise anomalies, MCDRs, structural assessments etc)
- Review and revise inspection strategies based on current structural conditions, platform age, and shortcomings
- Defining caissons and conductors specific inspection requirements, external or internal, using NDT techniques such as PEC, UT, SLOFEC
- Subsea inspection activities (scope definition, inspection reviews )
- Offshore survey to identify the construction limitations, structural arrangement and site requirements.
- Analysis and design of the support structures and connections
- Constructability review to offshore limitations (maximum frame element sizes, no welding offshore etc,)
- Detail design of caisson support, installation frame, pull in winch support frame to AISC LRFD
- Attending the weekly meetings with the client and all related disciplines to discuss the project progress, requirements and problems
- Design of lifting arrangements
- Project HAZID and ARA (Activity Risk Assessment) activities